Custom Lighting for Commercial Projects
Decorative fixtures developed around a commercial project brief.

Commercial interiors can require a single feature installation or a coordinated group of custom fixtures across shared spaces. Qilux reviews the design references, fixture schedule and practical requirements with the project team before the specification is confirmed.
Discuss Your Commercial Project
Define the spaces and the lighting scope
Identify the areas included in the brief, such as a reception, atrium, restaurant, showroom or shared interior. Describe whether the decorative fixture is a focal element, a repeated feature or part of a coordinated package.
Where architectural or general lighting is supplied by another party, make that boundary clear. The decorative fixture brief should align with the wider project without assuming responsibility for services outside the agreed scope.
Translate the design into a fixture specification
Reference images communicate form and atmosphere. Drawings and dimensions help define the actual item. Review materials, finish samples, light-source requirements and mounting conditions together so the proposal has a clear basis.
The intended environment also matters. If the installation has special exposure, cleaning, control or access requirements, raise them before selection. Suitability is assessed for the proposed fixture rather than inferred from its appearance.
Confirm samples and variations
Agree which physical samples or component references are appropriate for review. A large installation may need a section sample; a repeated pendant may need a complete fixture. Record what each sample demonstrates and what still requires confirmation.
If different versions are required across the project, give each one a clear reference. Changes to dimensions, mounting or controls should remain visible in the schedule rather than being hidden under one generic product name.
Coordinate the production and site programme
Confirm quantities, approved revisions and target dates before production is released. Where deliveries are phased, agree the grouping and identification that will help the site team receive and store the fixtures.
Packing and handover information should reflect the actual assembly. Separate fragile parts, fixing hardware and any requested spares so they can be located when needed. Installation and commissioning responsibilities remain defined by the project agreement.
Prepare a useful enquiry
Send the project type and location, design references, approximate dimensions and quantities, relevant installation drawings and the required dates. Include any mandatory documentation or control requirements so availability can be reviewed early.