Project Lighting Capabilities
From an initial design brief to an agreed production and delivery scope.
Custom lighting involves a sequence of connected decisions. Qilux coordinates the fixture requirements with project teams so the design, samples, production references and delivery information remain aligned.
Drawing and specification coordination
We review the design references and information supplied for the proposed fixtures. Dimensions, materials, finishes, installation conditions and outstanding questions need to be brought together before the production specification is approved.
Keep the fixture schedule and drawings linked by model reference and revision. The agreed scope determines which development documents are produced and which site information must come from the project team.
Materials and finish references
Material and finish samples help establish a practical reference for appearance. Review the relevant surfaces and components together, including any natural or process-related variation that needs to be agreed.
The availability and suitability of a material are confirmed for the proposed design and intended environment. Descriptive material names alone are not a substitute for an approved reference.

Samples and mock-up coordination
Agree the purpose of the sample before it is developed. The review may cover appearance, dimensions, mounting interfaces, operation or a specific detail. A component sample and a complete fixture answer different questions.
Comments, revisions and approvals should identify the exact model and version. Where a mock-up room is involved, keep the fixture review aligned with the room drawings and related design decisions.
Production and quality coordination
The confirmed specification, sample and finish reference form the basis for the order. The scope of inspection, acceptance points and any required records should be agreed for the fixtures being supplied.
Changes during the project need a documented review of the affected quantities, drawings, price and timing. No generic inspection statement replaces the actual agreed criteria for an order.

Project packing and delivery
Packing is planned around the fixture, fragile parts and delivery arrangements. Discuss component separation, labels, hardware identification, phased shipments and any requested spare allowance before dispatch.
Room, floor or area references can be incorporated where agreed. The labels and packing information should use the same model references as the project schedule.

Technical handover and ongoing support
Available product information, assembly instructions, installation details and maintenance guidance are confirmed for the selected fixtures. Requirements for testing, control compatibility or market documentation should be raised during the enquiry.
Site installation, structural verification and commissioning responsibilities must be agreed between the relevant project parties. Additional assistance is defined by the order scope rather than assumed from a general website statement.
Discuss the requirements that matter to your project