Hotel Guestroom Lighting Packages
One room brief. A coordinated fixture set.

Qilux works with hotel project teams to develop decorative guestroom lighting around the room design and fixture schedule. Bedside, reading, desk and floor lights can be considered together while each fixture retains its own practical specification.
Build the package around the room types
Begin with the lighting items required for each room or suite type. Note the quantity per room and the number of rooms, along with any accessible-room, handed or layout variations that affect the fixture.
An overall total is useful for an initial enquiry. A room-by-room schedule provides a clearer basis for confirming the production order and identifying where similar items differ.
Coordinate the visible details
Finishes, shades, diffusers and proportions should work together across the room set. A wall light and a table lamp may use different materials or construction, so a shared finish name alone does not fully define the appearance.
Review representative samples and agree the reference for each material or surface. Identify any acceptable variation before approving the wider order. Later changes to one fixture should be checked for their effect on the rest of the package.

Resolve operation and installation early
Confirm the location and purpose of each light. Reading, ambient and desk lighting can have different switching and control requirements. Document the requested behaviour and have the proposed component combination assessed accordingly.
Mounting positions, backplates, cable routes, plug arrangements and access for maintenance should be coordinated with the room drawings. Specify handed versions where relevant rather than leaving the distinction to the installation team.
Use the mock-up as a review stage
A mock-up brings the fixture into its intended context. Agree which items the sample covers and review the appearance, proportions, accessible controls, mounting fit and maintenance access with the project team.
Record comments against model references and drawing revisions. Where a change is approved, clarify whether a further sample is needed and how that affects the programme. The approved record should identify the reference used for production.
Keep the rollout organised
Before production, confirm quantities by model and room type, finish references and the delivery programme. Where helpful, agree packing references by floor, room or installation phase.
Discuss protective packing for shades, separate fixing hardware and any spare-parts allowance. These should be confirmed for the order rather than assumed to be standard across all products.
Share your room drawings and fixture schedule
Include the project destination, room types, approximate quantities and target mock-up and delivery dates. If part of the design is still open, identify the decisions where support is needed.